The parking lot elevator at Terryberry Branch is not working. Members will need to use the accessible ramp at the Mohawk entrance and the inner elevator. We're working to get it fixed quickly.
Please note that the audio volume levels on our public computers are having issues. The estimated time of disruption is unknown at this time. Thank you for your patience.
As the 1st floor renovation wraps up, the Sherwood Branch will be closed on Thursday, June 5, to reset the spaces. Service hours will resume on Friday, June 6. Thank you for your patience.
Concession Branch's children's department will be closed on the morning of Monday, June 2nd for minor repairs. We apologize for the inconvenience.
The accessibility ramp at Mount Hope Branch is damaged. The handrail is not available. The ramp will not be available while being repaired. We aim to fix it quickly.
All HPL Branches are closed on Friday May 30 for Staff Development. Bookmobile is off the road and Extended Access is not available. HPL's online card registration, catalogue and eResources are not available until 5pm due to scheduled maintenance. All branches reopen Saturday May 31.
Due to the ongoing roof repair project, noise and parking disruptions are expected to continue until the end of June. Thank you for your patience.
Until Saturday May 31, the Ancaster Branch is temporarily relocated to the Ancaster Rotary Centre, 385 Jerseyville Road West, Ancaster. The Wilson Street branch is closed for a roof and HVAC replacement and is expected to reopen on Monday June 2 at 9am.
The digital microfilm machines at Central Library are not working. A single analog machine is available, but it doesn't print. We aim to have the digital devices repaired as soon as possible. We apologize for the inconvenience.
Please be aware of online phishing attempts impersonating Hamilton Public Library and Library Staff. HPL does not solicit paid freelance opportunities through social media or other messaging applications. HPL does not request personal or banking information through social media or require financial compensation when reviewing job applications. Please report phishing schemes to communications@hpl.ca. If you think you are a victim of fraud, please call the Canadian Anti-Fraud Centre at 1-888-495-8501.
Mountain Steps
There were originally 7 sets of city-built stairs up the escarpment. The original locations were Chedoke Park, Dundurn Street, James Street, John Street, Ferguson Avenue, Wentworth Street, and Ottawa Street.
Currently there are 5 sets of stairs up the escarpment in addition to a privately-built set of steps. After the Jolley Cut was rebuilt, the John and Ferguson steps disappeared and their remnants were incorporated into the walkways at Sam Lawrence Park.
Chedoke
These steps connect the West Mountain to the lower west city, coming close to the front door of the Chedoke Civic Golf Course clubhouse. There are 289 steps.
Dundurn
The original Dundurn wooden steps were replaced in the 1990s by steel steps. There are 326 steps.
James
The original James Street wooden steps were replaced in 1987. The stairs originate at Southam Park on the mountain at the top of the Claremont Access. There are 227 steps.
Wentworth
The original wooden steps built in 1903 consisted of 6” to 7 ¼” risers. The stringers rested on cedar posts sunk 4-7’ in the ground. The original staircase had 570 steps. After a rock slide in March of 1983 they were replaced with metal steps just east of the position of the original steps and they now follow the path of the old East End Incline Railway. There are 498 steps.
Kenilworth
The Kenilworth steps connect the East Mountain to the Escarpment Rail Trail/Bruce Trail, and continue down to the Rosedale area of Hamilton. There are 228 steps.
Before the city completed construction on the Kenilworth stairs, a privately built set of steps named Uli’s Steps connected the upper and lower city. These steps were built as a retirement project by a Hamiltonian named Uli who spent two years on the project. They have 305 steps.